Pika next to Runway on plan limits
Pika and Runway publish their plan limits differently on 6 of the eight: queue lanes, storage, seats, project caps, unused credits and extra credits. From 3 source pages, read 2026-09-25 to 2026-10-25; no maker pays to be listed.
| Limit | Pika | Runway |
|---|---|---|
| Generations at once | A number per plan | A number per plan |
| Priority and slow lanes | A priority queue on some plans | A slow lane that spends no credits |
| Storage allowance | Not stated on the pages read | A set amount per plan |
| How long files stay | Not stated on the pages read | Not stated on the pages read |
| Seats and collaborators | Not stated on the pages read | Counted per seat |
| Project caps | Not stated on the pages read | A project cap per plan |
| Unused plan credits | Reset each cycle | Roll over on top plans |
| Extra credits | Bought credits expire later | Extra credits on sale |
Inclusion rule. The eight limits every tool on the sheet is read for. Order. The order limits take on every tool page.
1How the two compare
Runway publishes storage, seats and project caps, which Pika's pages leave out. Both publish generations at once the same way: a number per plan. Both publish queue lanes, in different forms: a priority queue on some plans for Pika, a slow lane that spends no credits for Runway. Both publish unused credits, in different forms: reset each cycle for Pika, roll over on top plans for Runway. Both publish extra credits, in different forms: bought credits expire later for Pika, extra credits on sale for Runway. Neither publishes file keeping.
2The published wording where they differ
Priority and slow lanes
Included: Priority queue
Pika, pricing page
Generations in Unlimited Mode may take longer to start and run fewer at a time; for faster generations and more simultaneous generations, switch to Credits Mode.
Runway, Unlimited Mode help article
Seats and collaborators
Pika publishes nothing on this limit.
2 to 9 members in one workspace
Runway, pricing page
Unused plan credits
Plan credits refresh each billing period and do not roll over.
Pika, pricing page
On the Max plan, up to one month of unused credits rolls over to the following month.
Runway, pricing page
- Top planA priority queue on the top plan
- Unlimited ModeUnlimited Mode on Pro and Max: no credits, slower to start, fewer at once
- Team planA team plan counted per seat, with 2 to 9 members in one workspaceTeam & Enterprise tab
- Credits FAQPlan credits refresh each billing period and do not roll over
- Credits FAQUp to a month of unused credits rolls over on the Max plan only
3Pika and Runway against a third tool's published limits
| Limit | SceneMixer | Source |
|---|---|---|
| Priority and slow lanes | A priority queue on the top three tiers | SceneMixer, guide to what a paid plan changes |
| Storage allowance | Upload storage grows with the tier; generated files do not count | SceneMixer, guide to what a paid plan changes |
| Unused plan credits | Membership credits land in the same balance as bought credits and do not expire at month end | SceneMixer, guide to what a paid plan changes |
Inclusion rule. Limits on which the two tools differ and SceneMixer publishes a figure or a rule. Order. The order limits take on every tool page.